Connect with us

Airlines

Emirates invests US$ 135 million in new pilot training centre

This Cargo company has placed a new order for 10 Boeing 777-8 aircraft.

 Emirates will soon build an advanced training facility to accommodate 6 Full Flight Simulator Bays (FFS) for its future Airbus A350 and Boeing 777X aircraft. The brand new, 63,318 sq. ft. facility is slated to open in March 2024.

The new building will be adjacent to the existing Emirates Training Facilities in Dubai, which will provide a great integration and close proximity to all the other pilot training centres.

Advertisement

Airbus’ first fully owned training facility in Asia to be established close to New Delhi’s Indira Gandhi International Airport(Opens in a new browser tab)

Pilot trainees will also benefit from being able to set-up and configure the cockpit environment using bespoke devices as part of the pilot training module and upload the data to the Full Flight Simulator (FFS) prior to commencing their training session. This innovative, first-of-its-kind concept is designed to shorten the trainee’s preparatory time inside the simulator, help them maintain focus and take full advantage of the training duration.

Advertisement

With the addition of the new building to Emirates’ existing training colleges in Dubai, the airline will have the potential to expand its pilot training capacity by 54% per year. Across the airline’s training buildings, Emirates’ pilots will have increased flexibility and facilities to hone their flying skills with 17 full flight simulator bays offering a capacity of more than 130,000 training hours a year.

These are the 8 benefits of being an Emirates Pilot.(Opens in a new browser tab)

Advertisement

In line with the scheduled delivery of Emirates’ first Airbus A350 aircraft, the airline’s newest training college will commence training its first batch of A350 pilots by June 2024.

In addition to modern training facilities for its flight deck crew, the airline offers a range of world-class training and development programmes for its workforce and for other aviation professionals. In Dubai, these include: the Emirates Flight Training Academy for cadets, Emirates Aviation University, Emirates Cabin Crew Training Centre, and numerous programmes specially created for different segments of its employees.

Advertisement
Advertisement

Airlines

Air India Express Aircraft Engine Part Falls Outside Delhi Airport; DGCA Orders Probe

Air India Express flight skids off runway while landing at Kochi airport

The Directorate General of Civil Aviation (DGCA) has launched an inquiry following reports that metal fragments were discovered at Delhi’s Indira Gandhi International Airport after an Air India Express flight made an emergency landing on Monday evening.

The emergency landing was prompted by a detected engine fault, but fortunately, the landing was executed safely without any injuries to the passengers.

Advertisement

The situation began when crew members of the Air India Express flight reported an engine issue, leading to the emergency landing. The DGCA has confirmed that a thorough investigation is underway and has directed that the aircraft undergo a comprehensive safety inspection.

Air India Initiates Construction of MRO Facility at Bengaluru Airport

Advertisement

The discovery of metal debris outside the airport has raised concerns, prompting the DGCA to probe whether these fragments are linked to the aircraft involved in the emergency landing. Authorities are particularly focused on whether the metal pieces, which were found near the airport, originated from the same Air India Express flight that experienced engine trouble.

While preliminary assessments suggest that the debris could be a broken blade from an aircraft engine, the exact source remains unconfirmed. The airline has yet to verify if the metal fragments are from their aircraft.

Advertisement

Airbus Beluga to Deliver Spare Parts for Stranded British Airways A350

The Delhi Police, working in conjunction with the DGCA, have initiated their own investigation to determine the origin of the metal pieces. A technical team is set to analyze whether the fragments are associated with the aircraft in question. As the investigation continues, a case has been filed with the airport authority to address the matter.

Advertisement
Continue Reading

Trending