Aviation
Embraer Develops Cargo Transportation Solutions for Commercial Aircraft
Embraer Develops Cargo Transportation Solutions for Commercial Aircraft
São José dos Campos, Brazil – July 24, 2020 – With the significant decline in the number of airline passengers and the booming demand for air cargo capacity, Embraer has developed cargo transportation solutions for its line of commercial aircraft. With fewer commercial flights, which carry both passengers and freight, there’s a critical need for more cargo space.
ANAC, Brazil’s civil aviation regulatory authority, has granted exemption for the carriage of additional freight on Embraer passenger aircraft. Embraer published Technical Dispositions for the ERJ 145 and E-Jets families of commercial jets, including the E-Jets E2s, which explain how to accommodate cabin freight. A Service Bulletin is available for the EMB 120.
Boom Supersonic to Roll Out Historic XB-1 Demonstrator Oct. 7
In addition to placing small packages in overhead bins and stowage compartments, cargo items can be placed on each seat, subject to certain restrictions. The payload capacity is significant. For example, a fully loaded 96-seat E190 can carry 6,720 lb (3 metric tonnes) of cabin freight in addition to under floor cargo. A 118-seat E195 can carry 8,260 lb (3.75 metric tonnes).
Airbus Launches A220 ACJ Business jet and wins first six TwoTwenty orders in one day.
Customers can opt for a floor-mounted freight configuration if their cargo cannot fit on passenger seats. This solution permits the removal of up to 70% of the passenger seats, with the remaining areas accommodating for items on the cabin floor. Freight must be contained in approved netting that attaches to the inboard and outboard seat tracks. This solution has already been developed for a first generation E195 jet for Azul Cargo, in Brazil.
Cabin payload capacity for the ERJ145 is up to 1,750 lb (0.8 metric tonnes) and up to 5,194 lb (2.36 metric tonnes) for the E190-E2. For customers needing even more capacity, Embraer may offer a Service Bulletin for full cargo configurations, as has been done for the EMB 120. These layouts give operators the flexibility to carry larger floor-mounted freight items in the cabin.
Aviation
Lost Tool Found in Qantas A380 After 34 Flights
An Australian Transportation Safety Bureau (ATSB) investigation recently revealed that a Qantas A380 operated 34 flights with a 1.25-meter nylon tool lodged in one of its engines.
This turning tool, used during borescope inspections to rotate the intermediate-pressure compressor, was left behind during scheduled maintenance at Los Angeles on December 6, 2023. It remained inside the engine until it was discovered by maintenance staff during a subsequent check at Los Angeles on January 1, 2024.
China Takes the Lead in Sixth-Generation Fighters with White Emperor B
The ATSB report highlights two critical lapses. First, maintenance engineers failed to notice the tool during final checks for foreign objects after the borescope inspection. Second, the lost tool procedure was not activated when the tool was identified as missing.
The certifying engineer ultimately cleared the aircraft for service without accounting for the misplaced tool. During the time qantas films the tool was inside, the A380 completed 34 flight cycles, accumulating nearly 294 hours without any noticeable effect on engine performance.
Although the tool was deformed by high-energy airflow within the engine, there was no reported damage to the engine itself. ATSB Chief Commissioner Angus Mitchell commented.
India’s C-295 to Gain Advanced Weapons for Maritime Surveillance
“This incident underscores the importance of following established maintenance protocols. Engineers missed the tool during foreign object checks, and the required lost tool procedure wasn’t started after realizing the tool was missing.”
Following the investigation, the airline issued a safety directive, urging all engineering and tool storage teams to adhere strictly to these protocols to prevent similar incidents in the future.
A qantas spokesperson stated, “While the tool didn’t impact engine performance, we take this incident very seriously. It is critical to follow the correct lost tool procedures.”
-
Aviation2 months ago
Boeing confirms 797: A New Era for Mid-Size Aircraft
-
Aviation2 months ago
Microsoft Flight Simulator Raises $3 Million to Bring Back the An-225 Mriya
-
Aviation2 months ago
Lockheed and Tata Team Up to Build C-130J MRO Facility in India
-
Airlines2 months ago
Qantas Engineers Stage Walkout Over Cost of Living Concerns
-
Airlines2 months ago
Qatar Citizens Can Travel to the United States Without a Visa
-
Aviation2 months ago
Boeing Offers 25% Pay Increase & Promise to Build Next Plane in Seattle
-
Aviation2 months ago
Qatar Airways bans these new Electronic Devices on plane
-
Airlines2 months ago
Emirates Ends 28-Year Singapore-Melbourne Fifth Freedom Route