Connect with us

Aviation

FAA completes re-certification test flights of Boeing’s 737 MAX

FAA completes re-certification test flights of Boeing's 737 MAX

The FAA and Boeing today completed the certification flight tests on the Boeing 737 MAX. During three days of testing this week, FAA pilots and engineers evaluated Boeing’s proposed changes in connection with the automated flight control system on the aircraft. While completion of the flights is an important milestone, a number of key tasks remain, including evaluating the data gathered during these flights. The agency is following a deliberate process and will take the time it needs to thoroughly review Boeing’s work. We will lift the grounding order only after FAA safety experts are satisfied that the aircraft meets certification standards.

The remaining tasks include:

Advertisement
  • JOEB Validation & FSB Review – The FAA’s Flight Standardization Board (FSB) and the Joint Operations Evaluation Board (JOEB) which includes international partners from Canada, Europe, and Brazil will evaluate minimum pilot training requirements. The FSB will issue a draft report for public comment addressing the findings of the FSB and JOEB.
  • Final FSB Report – The FAA will publish a final FSB report after reviewing and addressing public comments.
  • Final Design Documentation and TAB Report – The FAA will review Boeing’s final design documentation in order to evaluate compliance with all FAA regulations. The multi-agency Technical Advisory Board (TAB) will also review the final Boeing submission and issue a final report prior to a final determination of compliance by the FAA.

JetBlue takes delivery of A321LR with the first Airspace interior

  • CANIC & AD – The FAA will issue a Continued Airworthiness Notification to the International Community (CANIC) providing notice of pending significant safety actions and will publish an Airworthiness Directive (AD) that addresses the known issues for grounding. The AD will advise operators of required corrective actions before aircraft may re-enter commercial service.
  • FAA Rescinds Grounding Order – This marks the official ungrounding of the aircraft, pending completion by operators of the work specified in the AD, along with any required training.
  • Certificates of Airworthiness – The FAA will retain its authority to issue airworthiness certificates and export certificates for all new 737 MAX airplanes manufactured since the grounding. The FAA will perform in-person, individual reviews of these aircraft.
  • Operator Training Programs – The FAA will review and approve training programs for all part 121 operators.
Advertisement

Aviation

Boeing to Slash 17,000 Jobs Worldwide Amid Ongoing Factory Strike

Boeing to Slash 17,000 Jobs Amid Ongoing Factory Strike

Boeing, one of the world’s largest aerospace manufacturers, is facing a severe crisis. The company announced on Friday that it will lay off 17,000 employees—roughly 10% of its workforce.

This decision comes amid a prolonged strike, production delays, and ongoing safety concerns with its aircraft. Kelly Ortberg, Boeing’s CEO since August, delivered the news, stating, “Our business is in a difficult position, and it is hard to overstate the challenges we face together.

Advertisement

Beyond navigating our current environment, restoring our company requires tough decisions, and we will have to make structural changes to ensure we can stay competitive and deliver for our customers over the long term.”

Qatar Airways Introduces Avios Earning & Redemption for Private Jet Flights

Advertisement

Boeing has been struggling financially, with the last reported profit in 2018. The company’s largest union, with 33,000 members, has been on strike for nearly a month after rejecting a labor deal. The ongoing walkout is reportedly costing Boeing around a billion dollars each month as negotiations remain at a standstill.

Compounding these issues, Boeing’s much-anticipated boeing 777x wide-body plane is now six years behind schedule, with deliveries postponed until 2026. This follows the discovery of structural damage during flight tests. Boeing also announced it will stop manufacturing its commercial 767 freighters after fulfilling its remaining orders by 2027.

Advertisement

Financially, the company expects to report a significant third-quarter loss—nearly $10 per share—and a total cash outflow of $1.3 billion. boeing new aircraft commercial airplane unit faces a $3 billion pretax charge, while its defense business will absorb an additional $2 billion hit.

Embraer’s E-Freighter is Certified by the FAA

Advertisement

The strike has severely impacted production at key boeing facilities, particularly in Seattle, where half of the company’s nearly 150,000 employees work. Since 2019, Boeing has lost approximately $25 billion.

Ortberg was brought in over the summer to help the company regain public trust following safety concerns, especially surrounding the 737 Max line, which was involved in two deadly crashes. Earlier this year, a separate incident involving a panel popping off a 737 Max mid-flight reignited concerns. A Federal Aviation Administration investigation following the event found that Boeing had failed 33 out of 89 product audits.

Advertisement
Continue Reading

Trending